quite a bit of progress today all things considered
First off I had to make a retaining ring for the iris blade control disk
the retaining ring is 1/8 by 3/4" flat bar bent the hardway. I used my bender roller to accomplish this
Bender roller combo
setting up for offset drilling of the iris blade stem support sleeve
the retaining ring the stem supports and the control linkages are now in place
I just have to weld on some bolts to the control disk then make a flange and "T" for the air supply and the cleanout of the toyere then the underside will be pretty much done
![]()

LinkBack URL
About LinkBacks







Reply With Quote

Bookmarks