At least 2 of the 3 companies I visited and made contact with however being a remote contact as it was have already finalized a quote for me one has even sent it formally via Email within .3% of my initial estimate of where I thought the cost would be. I haven't received the final on the 2nd as of yet as the grades of steel had to be altered bit. I had an idea this might happen with newer grades being available which I had not been familiar with. I am amenable to these alterations when I can use a stock item instead of special ordered this always means a better chance of ongoing availability and sometimes a lower overall cost as well especially when dealing with metal which has to be formed as long as the KSI and minimum yields remain within my requirements

LinkBack URL
About LinkBacks


Reply With Quote

Bookmarks