Companies that do this charge by the pound You should have your materials to be dipped sand blasted washed and dried and if there and tubular or areas where the zinc can collect there needs to be holes drilled at the highest and lowest points otherwise sealed tubes cannot get coated on the inside or the zinc will settle in the cavities and add weight and in general make for a screwed up looking job.

LinkBack URL
About LinkBacks

Reply With Quote

Bookmarks