I wrote some software for tracking the explosives used by some big Wyoming coal mines. For them, the drill and prep for a blast on that order only takes about two weeks. The engineering and planning much longer. They average 2-4 smaller blasts (30-75 holes each) every day and on average blow up about 7 million pounds of explosives each month!