When the workshop was built here, we used 2 cranes to hoist the roof up.
The columns swung on a bolt each as a pivot. A "hive" of activity to secure the columns to the plates concreted in and where now connected to the roof.
Lots of heavy rope on hand to tie on diagonals to secure whilst top hats and cladding were added to walls.

LinkBack URL
About LinkBacks
Reply With Quote

Bookmarks