About a month ago we drove to Abilene there were a couple trains on a sidling loaded with blades from what we could see there were probably enough blades to outfit maybe 10 turbines on each train. This makes a lot of sense to me to be able to transport in volume to as close to the final destination as possible. Faster more economical less possibility of transport damage comes to mind first.