Free 186 More Best Homemade Tools eBook:  
New: 300+ fresh build posts/day from 275 forums → BuildThreads.com

User Tag List

Results 1 to 6 of 6

Thread: 10-story apartment building assembled in one day - GIF

Hybrid View

  1. #1
    Supporting Member BuffaloJohn's Avatar
    Join Date
    Aug 2019
    Location
    Oregon, USA
    Posts
    1,310
    Thanks
    502
    Thanked 784 Times in 465 Posts

    BuffaloJohn's Tools
    OK, it took a day to assemble - how long did it take to build all the modules and stage them for delivery...
    Last edited by BuffaloJohn; Oct 10, 2024 at 11:21 AM.

  2. #2
    Supporting Member mklotz's Avatar
    Join Date
    Aug 2015
    Location
    LA, CA, USA
    Posts
    3,720
    Thanks
    376
    Thanked 7,194 Times in 2,349 Posts

    mklotz's Tools
    Quote Originally Posted by BuffaloJohn View Post
    OK, it too a day to assemble - how long did it take to build all the modules and stage them for delivery...
    Not to mention the time needed to hook up all the utilities - electric, water, waste...
    ---
    Regards, Marv

    Smart phones are to people what laser pointers are to cats
    Homo sapiens is a goal, not a definition

  3. #3
    Supporting Member Frank S's Avatar
    Join Date
    Aug 2015
    Location
    Peacock TX
    Posts
    12,619
    Thanks
    2,678
    Thanked 11,117 Times in 5,395 Posts

    Frank S's Tools
    Quote Originally Posted by mklotz View Post
    Not to mention the time needed to hook up all the utilities - electric, water, waste...
    If the modules were properly planned which I do not doubt they probably were. Then just about everything would be plug and play.(note the 12 second point where pipes are sticking above the top of the module) For water and waste a simple matter of belled pipes to accept the one above then after the module has been lowered in place a compression clamp would be all that would be required for the water each module would be pre plumbed with a pressure reducing delivery valve. It is a general practice to have water storage on the roofs of high-rise buildings.
    Most countries are smart enough to use 3 phase electricity so a 5-conductor pin and socket system requiring only to be tightened afterwards as well.
    Chinese engineers are nothing if not efficient in designing systems to fit together perfectly on very large scales, I'd almost wager the only thing left to do by the end of the day would be to flip on the circuit breakers and fill the water storage. People could be moving in by nightfall



    2,500+ Tool Plans
    Last edited by Frank S; Oct 10, 2024 at 01:59 PM.
    Never try to tell me it can't be done
    When I have to paint I use KBS products

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •