Hit a major problem with the timing gears in that the crank gear was found to have cracked from the keyway to the root. I had no option but to cut another gear 16T 20 DP from some tough mystery metal that will be case hardened. The keyway was cut using the top slide as a ram which does give it a good work out.
Click image for larger version. 

Name:	IMG_20220312_163303272.jpg 
Views:	162 
Size:	1.63 MB 
ID:	42425
Click image for larger version. 

Name:	IMG_20220408_102915516.jpg 
Views:	176 
Size:	1.96 MB 
ID:	42426
The heads/ valves and barrels are ready so looking forward to some progress soon. The pistons are in good condition reamed for new gudgeon pins, apart from very coked up.
Click image for larger version. 

Name:	P1010104.jpg 
Views:	159 
Size:	776.3 KB 
ID:	42427
There is a lot of polishing and nickel plating to do down the line before I get to my least favourite task of tinware and painting.