Originally Posted by
jdurand
The contractor and workers are cheery. The contractor still wants to buy our place to tear down and build. We haven't seen the owners recently, but when they come by it's often for a short walk-through.
Our new house is working through a glitch, seems nobody told the roofer that the workshop has a skylight. Oops. They're having a meeting today to adjust the framing as required, at least the roof isn't skinned yet. Also to make sure the two skylights are in the plans for the roof over the 2 story section.
To head off potential problems I gave them a drawing of how we want the work area in front of the workshop roofed (after the house is done). I figured I should get that in before someone builds something in the way of the work area cover. It's going to be nice having a 3 x 5 meter flat work area with a high current welding outlet and regular power. At our California house it's hard to find level ground, the driveway is very sloped and can be used but not well.