I too was doing metal building about 20 years ago. That shear was about $1500 back then and is made for the profile of the metal that you are using. The guy siting on the metal is very important as the sheets would always tend to walk as the shear was coming down.

LinkBack URL
About LinkBacks

Reply With Quote

Bookmarks