Once the building partially collapsed and was most likely subsequently inspected the cranes must have been considered unsafe even to disassemble so a controlled demolition of the cranes would be in order, and new ones might be reinstalled if the building project is allowed to continue otherwise it may be brought down in a similar method by using a controlled blast. A huge waste, but maybe safer and cheaper to tear it completely down and start over at this point.

LinkBack URL
About LinkBacks


Reply With Quote

Bookmarks