PROGRESS!

Main roof up, side panels and track for hoist still need to go in as well as finishing the rain gutter. I'm sure the guys like working there a lot more since now they're out of the rain.

The work area (square-ish area in front of workshop) is about 16 feet wide x 13 feet deep. The porch will have a swing out railing to double as a loading dock.

Click image for larger version. 

Name:	2021-01-28_Driveway_Roof-3.jpg 
Views:	170 
Size:	75.4 KB 
ID:	38178

Click image for larger version. 

Name:	2021-01-28_Driveway_Roof-4.jpg 
Views:	183 
Size:	90.7 KB 
ID:	38179

Click image for larger version. 

Name:	2021-01-28_Driveway_Roof-5.jpg 
Views:	184 
Size:	70.1 KB 
ID:	38180

Click image for larger version. 

Name:	2021-01-28_Driveway_Roof-6.jpg 
Views:	175 
Size:	49.3 KB 
ID:	38181