In the past few weeks we have watched pile after pile of materials diminish and in some cases completely disappear.
It is hard to believe or even imagine that at one time with the exception of 5 pipes 4 I beams and a stack of purlin all of the materials for this building was hauled here as salvaged materials. I would have barely been able to have built a bare bones 2 car garage for the amount of cash I've spent on this thing.

LinkBack URL
About LinkBacks



Reply With Quote

Bookmarks