Borring rainy sunday afternoon
so I decideed to use it to finish my clamp
something I started
prepared parts for assembling and put it on hold
so,here's a start
all parts on the table,even more then necesary
and,unavoidable cup of coffe
the base is 100x100 mm L-profile (4x4 inch) which has been milled to take out radius in the angle
and 15 mm thick peace of sheet 200x200 mm
I left hanges to cool out while I was driiling wholes and tapping threads
I decided to fit all joints by bolts
to avoid aany distosions that could be caused by welding,to keep it square
and...
as the psotos say to you
then I was drilling wholes and fitting stuff an I forgot to take more photos step by step
for down lock I used a 20 mm thread with peace of 40x40 mm box cut under 45 degrees
for uper lock it's a 16 mm thread
right hine has pin that easily goes in and out for easier unlocking
and that's it
I'd like to see your comments here

LinkBack URL
About LinkBacks












Reply With Quote

Bookmarks