Notice on the article in Wikipedia that they do a cost per kilowatt hour. From $0.76 a kilowatt hour. Not competitive at all in 2008. To $0.03 a kilowatt hour in 2021 new construction. At that cost you can make money. 4 hours storage. You loose morning peak but can do evening peak. Things like this have to be coupled with storage. I was reading on compressed CO2 "battery" a while back and it is being made in Spain for storage purposes for a large solar voltaic array. Like anything large and expensive. When you get the better engineers involved and there's more off the shelf parts the prices go down. Same goes for the construction crews. One of a kind is always expensive. Once there are multiples the problems get worked out. Drawings are nothing until they are made in real life. And then the real engineering takes place.

LinkBack URL
About LinkBacks

Reply With Quote



Bookmarks