Ah yes - Ditch Paving. Here in the South we called that process "Fabric Formed Concrete". Being a DOT spec, it had a LOT of cement, sand and water. IIRC some jobs were rated for 8-10K PSI with a slump between .5 and 1 inch.
There are currently 1 users browsing this thread. (0 members and 1 guests)
Bookmarks