Oh i forgot to mention the slats, I cut lengths of 1" box section and welded them onto the inside angle of 1" steel angle, the slats are 1" x 1/4 steel bar the width of the bed and were used as the spacers and for alignment when welding in the box section. The slats just drop into the frame on completion and can be replaced as thy get cut to shreds. The frame is set on top of a tanked table, in my case an old steel silage trailer side, this will be my water bath to extinguish the sparks and hep reduce some of the nasties produced when plasma cutting. I'm sure if you have decided to build a plasma table you will already know what one does and the results and byproducts you get from one, I wasn't a chicken farmer so no sucking of eggs will take place here.

LinkBack URL
About LinkBacks
Reply With Quote

Bookmarks