Thanks guys for your welcome!
Currently I’m recovering from a heart attack, so am off sick until actual retirement, so not a lot has got done!
The garage is too cold at present, so it’s down to railway modelling at present.
It’s a hard life!!
The base plate and retaining clamps are done, along with the pillar and socket.
The sides, from and back of the tiling head are part fine.
I’m hoping to be able to attach it to the cross slide for working with material in the chuck, and the X/Y table for some small surface grinding and between centres sharpening.

Mike