Quote Originally Posted by kngtek View Post

What level of spindle runout do you get with your Unimat Mill? What drill mounting technique do you use to minimize drill runout? The Sherline threaded 5/32" Jacobs chuck is advertised at 0.003" runout, although they do offer a Morse arbour spindle chuck option which would reduce runout.
I've never really measured the runout on my Unimat (now permanently set up as a mill/drill press). Given the results mentioned above, it's not enough to interfere with drilling #75 holes. That's good enough for me.