Quote Originally Posted by Frank S View Post
By the time I have all of the fill in the shop the conduit will be almost 3 feet below the surface of the eventual slab
Click image for larger version. 

Name:	WP_20200321_16_48_33_Proep.jpg 
Views:	259 
Size:	336.9 KB 
ID:	34178
Conduit connected to the homemade 6x8x4 J box
Click image for larger version. 

Name:	WP_20200321_14_02_01_Proep.jpg 
Views:	256 
Size:	290.7 KB 
ID:	34179
What is the plastic pipe you used for the buried conduit? Looks like 3". I assume you have the wires installed already, unless you have some Greenlee power puller, and a helper to feed the wires.
Looks like your doing all the details toward the next big task of building walls.