My shop, which should be priority #1 is one of those things that requires net positive excess cash flow. Even though I have the poles up and the trusses made and enough materials to add in bridging cross and diagonal bracing between the trusses and steel to make a top plate for the perimeter of the building. I don't have purlins to attach the sheet metal or a means to secure the trailer load of PIR cold storage grade insulation that I have before the sheet metal can be installed on the roof.
I also have enough 38ft long sheets of corrugated galvanized sheets to cover a building 1 1/2 times the size of the one I am building.
What I need to do is to get a couple of these trailers finished so we can either sell them or lease them on for use to get the cash flow required to push me into resuming work on the building.
I live on Frank's time out here and things get done when they get done or they don't get done at all much to the aggravation of my wife LOL