Even after having to take time to change a tire then go to town get fuel have the tire fixed and a few other go to town things that had to be done.
I managed to get 4 purlin installed today these area at the highest part of the trusses so my scaffold was more of a its there as a fall stop than anything else since the center of the trusses are over 6 feet from the bottom of them it meant climbing on them and working while standing on the braces or sitting on top of the truss to weld them in place.
Click image for larger version. 

Name:	WP_20191226_17_07_00_Richcv.jpg 
Views:	226 
Size:	277.7 KB 
ID:	32783
This puts the to the point of either doing the back half of the same side or moving a lot of stuff to do the other side. Or going ahead and sheeting what I have to give me a 30 ft by 36 ft roof over head. On the one hand having a partial roof would be better than no roof but that means having to change up what I am doing. IT would mean I would have a completed area to put the project that is currently under the tent though and the tent has to come down soon anyway. Heck I have almost knocked it down already.
But I think I will carry on and install the other 10 purlin on the second half of the side I am working on then sheet the whole half then move everything from the other side and not have to take a step forward while taking 2 backwards.
The stuff that needs moved is the 3 axle set currently under the tent and the 50 ft trailer that I have on dollies and can only be moved sideways
Click image for larger version. 

Name:	WP_20191226_17_11_55_Richcv.jpg 
Views:	258 
Size:	395.5 KB 
ID:	32784

Click image for larger version. 

Name:	WP_20191226_17_12_33_Richcv.jpg 
Views:	230 
Size:	291.5 KB 
ID:	32785
Once I finish with the roof these bar joists will be used to make a 30 by 40 lean to on the south side of the building
Click image for larger version. 

Name:	WP_20191226_17_14_05_Richcv.jpg 
Views:	246 
Size:	616.1 KB 
ID:	32786
these white standing seam panels will be the roof of the lean to.
originally the bar joists and the panels were used as a cover for a large RV
I have almost enough panels to make a 30 ft wide lean to the full length of the building
Click image for larger version. 

Name:	WP_20191226_17_14_38_Richcv.jpg 
Views:	220 
Size:	343.4 KB 
ID:	32787
Click image for larger version. 

Name:	WP_20191226_17_15_20_Richcv.jpg 
Views:	217 
Size:	415.9 KB 
ID:	32788
This pile of pipes is what I will be using to run my air system throughout the shop I have close to 2000 feet of 1 " 1 1/4" and 1 1/2" pipe in that pile with a smattering of a couple hundred feet of 2 " & 2 1/2" pipe more than enough to plumb an air system with.
Click image for larger version. 

Name:	WP_20191226_17_15_09_Richcv.jpg 
Views:	245 
Size:	361.7 KB 
ID:	32789