Quote Originally Posted by Rikk View Post
Great progress considering you are working mostly alone or with minimal help. I'd bet it will be built better than if you paid for it to be done.
The only help if you can really call them that was for setting 4 of the trusses, or the wife holding 1 end of a tape measure occasionally.
I doubt if it will be built better or even as good as it would if I were paying to have it done. For one thing I would not have allowed it to be built from scrap, for another I can be a down right demanding tyrant when I'm paying for the labor because I expect anyone working for me to be proficient in their duties and to know how to do their job. Lastly having designed numerous pre-engineered structures the design would have been such that the thing would have been completed 6 months ago. but where's the fun in having something built for you.