
Originally Posted by
Frank S
The only help if you can really call them that was for setting 4 of the trusses, or the wife holding 1 end of a tape measure occasionally.
I doubt if it will be built better or even as good as it would if I were paying to have it done. For one thing I would not have allowed it to be built from scrap, for another I can be a down right demanding tyrant when I'm paying for the labor because I expect anyone working for me to be proficient in their duties and to know how to do their job. Lastly having designed numerous pre-engineered structures the design would have been such that the thing would have been completed 6 months ago. but where's the fun in having something built for you.
Bookmarks